Questions about suppliers on e-rtp process

Questions about suppliers on e-rtp process

The suppliers ‘selectable’ by GPO in the below page , are the one on boarded in Ariba or the one Codified in SAP ? 

Answer: All Vendor Code open for the P.org will be uploaded in Ariba before go live, Independently of on-boarded or not for Ariba : all these vendor code will be available for eRTP

 

Ariba on-boarding for P2O is only for :

  • eRFQ collaboration
  • Catalog loading.

 

Vendor OTV is to be used on for non-codified vendor, exactly as per today in MM.


    • Related Articles

    • E-RFQ : in the live platform how end users can search their request ?

      Thanks to find below some questions related to E-RFQ process : For test environment you have created some test lab to exercise them in the platform (data check file) , but in the live platform how end users can search their request ? they we will ...
    • Which item should I select to create my e-rtp?

      I was trying ERTP from AMK side. I have created two ERTP both needs Tan Yung Kong to approve as buyer, but inside KeePass, I do not have his login, can you help to add in? for me to complete the full process   Answer :  check your PR " AMK - ERTP ...
    • General questions about catalogs

      I did a pr on e-cat this afternoon under pascal decamps logon. I have few questions after this exercise. I took AXCELIS as supplier with plant of crolles 200 (0300/0323)   On actual Axcelis catalog (MDM) we have some items link to priority order. ...
    • E-cat with 2 items. Does the system will create 2 PO with 2 different buyer codes ?

      If a user create a request in e-cat composed by 2 items with different commodity , the system will create 2 PO with 2 different buyer codes?   Answer  : Yes, for each Purchase Group, there will be a PO created. If in the request E-CAT, there is two ...
    • The threshold in E-CAT for buyer authorization is depending on the supplier

      I did a couple of simulation including also Low amount as for the below screen shot and I’m in the authorization loop   May I kindly ask you   Threshold for Buyer Authorization set in the Test system for the e cat Why I’m in this loop ? My role is ...